We produced large precast concrete beams to form part of a rail bridge over the bypass in the Cheshire village of Alderley Edge near Wilmslow.

The beams weighed in at 133 tonnes which included 19 tonnes of steel reinforcement in each. They were loaded then delivered by specialist transport to site where they were subsequently assembled together with the steel bridge during the Christmas 72 hour railway closure.

Keep in touch