We supplied and erected the precast lift shafts for this very busy railway hub.

As part of the same contract, we also designed, detailed, manufactured and erected sprayed GRC segments to match the precast lift shafts supplied.

The GRC segments were cast onto a steel stud frame which was subsequently bolted back to a structural steel frame.

All units were erected over the Christmas engineering shutdown.  We carried out a trial erection at our premises to ensure that there were no unforeseen problems and then erected the lift shafts on Boxing day during the rail network shutdown.

 