Situated in the University of Plymouth campus, the Marine Building houses a wave tank testing machine.

We supplied demidec floor planks along with precast post tensioned beams spanning the width of the 16.5m building.

The demidec floors were designed to be left unpropped and then stitched into the beams and the insitu concrete frame. All of this concrete was left exposed to take advantage of its inherent thermal mass with no further decoration.

We also designed, supplied and erected the internal and external precast stairs, cantilever roof panels as well as the external cladding for this contract.